Worked on the top half of the divider today. As I mentioned I redid the first run at it. The access holes where way too high. I can almost touch bottom now with them moved down. and the tank still has to go on some plywood and Styrofoam so it will move up a bit. Add some sand and I should be able to reach pretty far down there.
The bottom half is just roughed in and clamped in place. I will still have to cut some plywood and Styrofoam. Plumb the tank and leak test it before I can finish the bottom half off.
The bottom half is just roughed in and clamped in place. I will still have to cut some plywood and Styrofoam. Plumb the tank and leak test it before I can finish the bottom half off.