acharpenter
Pitas' Pita
Lifetime Member
Event Committee
Meeting Host 2020
Meeting Host 2021
Meeting Host 2022
To do list:
Get tallest 2 baffles cut down by about 1.5" (or find a 30 long tank)
Zing down barbed bulkhead on sump, get a threaded cap - silicone in capped bulkhead to seal sump (or find a 30 long tank lol )
Need a 1.5" hole drilled - need 2-1.5" bulkheads and 1-1.75" bulkhead
1.5" gate valve
Plumbing pieces
I have the PVC primer, cement and silicone tape - I think.....
Get tallest 2 baffles cut down by about 1.5" (or find a 30 long tank)
Zing down barbed bulkhead on sump, get a threaded cap - silicone in capped bulkhead to seal sump (or find a 30 long tank lol )
Need a 1.5" hole drilled - need 2-1.5" bulkheads and 1-1.75" bulkhead
1.5" gate valve
Plumbing pieces
I have the PVC primer, cement and silicone tape - I think.....
